Just when you thought it was safe…

The last posts I have made on this blog, have had a more optimistic and positive tone to them. Indeed, things were looking reasonably rosy; not that that lasted too long. More nonsense at work means that demons I had hoped had been well and truly buried, have now been dug up and reanimated – not at my doing I hasten to add! SO the progress and optimism of August has been given a good skellping and I find myself anxious and jittery – again!!!

Save to say the 1/224’s have not progressed as I had envisaged, nor have the other bits and bobs. To say I am frustrated and down is a mild understatement.

Mostyn is due out soon, a visit to Taunton over the weekend of the 25th and 26th of October. This makes the recent travails even more irritating. I suppose I should be thankful that I will any new stock finished but whence you get banana skins slipped under your radar like this????

Yours phi##ed aff.
Iain

Advertisements

The new season…

Another summer has come to a dreich end and all those projects that have been hold started beckoning forth for attention.
Hence it came to pass, that the “Works” did stir once more…

Ambis etch silliness in action on more 12t standard BR vans, diagram 1/224 in this case.
Yes, more bl##dy vans but this show the last lap is well under way. I will admit that Mostyn is venturing out again in a few weeks time, a stimulus to get some stock finished once more.

Other projects are beckoning, something I have already mentioned here. They will appear soon, if only for my own tenuous hold on sanity. Arf!!!

Be seeing you

Sláinte
Iain

And new projects begin…

After all the silliness getting the recent stock finished, I have been taking some time to look at what I am intending to do the next few weeks/months. With all my health travails of the past 18 – 24 months, it is actually nice to able to do so without any “banana skins” or mishaps looming.

First up, a number of other BR fitted van projects are in various stages of building – Diag. 1/208, 1/213 and 1/224’s to be exact. These van projects aim to be the last ones built for Mostyn as we should have more than enough by then – I hope!
You then have some BR steel sided medfits which I had forgotten about. With the ups and downs of the most recent builds of this type, I had neglected to remember a box with some half built in it. I am again planning that these will be the last of this type built for Mostyn. This sort of stock for the Engineers Department is now at a healthy level. Other stock beckons for this sort of work.

I have been getting together the research work for some brand new projects. The first project revolves around the various 5-Plank wagons still in use in Engineers stock during the late 1970’s. We are talking about stock with a 10-foot wheelbase here so no springing or compensation will be used. It is envisaged that two kits, together with various other spares and bits, are going to get a good deal of usage:
1: Cambrian Models C107 SR (Diag.1375) 5 plank Open Wagon.
This design was not just built for the Southern Railway but indeed, the LNER had a number produced to this basic design under various diagram numbers. Add to this, the diagram, 1/034, built by BR to this basic design and a jolly good time is envisaged…
2: Parkside Dundas PC02A BR (Diag.1/039, 1/044) 13 Ton Open Wagon.
Based on an LMS design, a whole gamut of variations in underframes and brakes exist here. Indeed, the LMS built diagram was still in use in 1977 so I can logically produce a few dog-eared auld relics to go with the other pre-nationalisation beasties either already built or in the planning stage.
The second project revolves around the humble BR Grampus. The Parkside Dundas kit and other parts will form the basis of the build, which will include both fitted [Diag.1/574] and unfitted [Diag.1/572] types. The question of springing this batch of wagons will be addressed in one way or other. The wheelbase of the Grampus means that springing this stock is essential, the 12-foot wheelbase leaves one with no choice!

Well that is my coming months planned out so lets get it on.
Mind, knowing me I shall get distracted by some other naughtiness as well along the way…

Be seeing you.
Sláinte
Iain

The end… Well sort of…

The finish line of exhibiting at an show, is always a prompt to attempt to finish items of stock. Last weeks show in sunny Wigan was no exception. Even if it was a push, after the past few months of yet more illness, darkness and dribbling, I was going to get the below items finished.

Here are a few close-ups.

Yes the images are a bit rushed but needs must. Projects which seem to have taken forever are now completed and in service;  something which, at times, has appeared about as likely as England winning the World Cup!

And so what is next?
Well, a further batch of Diag. 1/224 vans is in progress as are some final Diag. 1/208 & 1/213 vans. These being the oddballs with different doors, ends, brake gear and so on.
I also need to finally finish the SPV that has taken an age as well. This beastie is primed and ready for a splash of banger blue. It will make a nice change to bauxite, grey and various combinations of filth and detritus!!!

Finally a thanks to Rugloanian for the Tunny Bars… Nice to meet one sir and I trust your wee man enjoyed his trip south of the border…

Be seeing you
Sláinte
Iain

PS. The weather on Saturday was awful but at least Wigan lost their Challenge Cup tie – it made all the palaver of parking and such worth it….. C’mon yew Saints!!!

spotify:user:iak:playlist:4Jv78UgGjaMqAAbi8qdy9b

Time waits for no one…

Afternoon to those who dabble in the wacky world of railway modelling. Soon enough, it will be showtime and the “Beeg Blue Beastie” will be out in the great wide world once more. That means a deadline looms and yours truly is hard at work…

The stock which has appeared here of late is now all lettered up and the weathering has begun in earnest. Mind, this evening will see some shock vans getting their distinctive white rectangular markings drawn on which will be fun. The auld Rotring type pen has not seen the light of day in ages so this could be fun and in more ways than one. I aim to get more images up soon so stay tuned.

Now after the Wigan show has passed, I have yet more vans to get to grips with and finish for Mostyn. I even aim to get some of my own projects finished finally over this coming months! Mind, I have stated that before so we shall see! New projects are in the planning but I will fulfil that pledge I made to finish projects afore starting any major new ones. I would like to avoid the spectre of projects dragging on in future if I can…

Be seeing you
Sláinte
Iain

PS… Have a listen to this. Talk about evasive? Politicians are such numpties!!!